Practical findings from our building and property maintenance work, with photographs showing how problems were investigated and repaired.
RECENT PROJECT · TONBRIDGE
Lift lobby remedial works at Whitefriars Wharf
Preparation, making good and redecoration to the lift-lobby walls, ceiling, bulkheads and boxed sections. The completion record notes that the exposed concrete floor remained in place and outside the recorded finishes.
High- and low-level ventilation grilles were fitted to the cupboard door, alongside eight signs: one entrance sign, four numbered parking-bay signs and three visitor-parking signs. This followed the decking refurbishment completed in October.
A practical guide for managing agents and property owners, based on a completed Tonbridge installation, covering scope, access and photographic completion records.
A completed external pipe repair shows what useful photographs, a recorded water test and a clear distinction between completed and outstanding work can tell property owners and managing agents.
A washing-machine inlet valve and a concealed soil-stack joint caused damage across two floors. Read how we found both sources, completed the repairs and reinstated the interiors.